A multitool for Realistic Boiling Water Reactor Simulator game on Roblox
Features
MWe to APR conversion
Can convert MWe demand and plant usage to a more or less approximate APR target.
Note
MWe to APR formula for Unit 2 may not be entirely accurate.
It comes to multiple factors, mostly being new LRPM system and the fact that Unit 2 has analog gauges, thus autocontrol could not have been used to sustain certain APR value for data collection.
If you are to use this new formula - keep in mind that it is totally not 100% accurate and may be off by ±0.5% (or even more).
I DID NOT check if turbine valve/feedwater flow still match up, but as far as I am aware, they do.
Note
Keep in mind that MWe to APR conversion is not 100% perfect, and there are a couple of reasons why the resulting APR may be wrong:
- Steam Pressure is not at 7.1 MPa
- At leat one preheater is broken/disabled (using this calculator is a way to check them btw)
- You have not updated plant usage
- Steam sealing pressure is not at 0.25 bar (applies only to unit 2)
Other than that, the formula is pretty precise (≈1 MWe difference) if you are using automatic formula selection.
Will also show an approximate feedwater flow, which should be treated as a rough approximation (±30 kg/s).
Useful when you are making rapid adjustments and want to just forget about MCC.
Auxilary stats
Approx turbine inlet, condenser flow (for u1), steam sealing (for u2) and oil cooling (for u2) are also calculated.
To cheese condenser in unit 2, set recirculation to 100%, one SJAE to 100%, Sniffer valve to 60% and then adjust sniffer as needed.
Trust me, you better cheese the condenser in unit 2 and not run it normally.
Pump repairs on high outflow
Allows to calculate whether you can run without a pump without changing your load.
Pretty precise I would say, at least it worked for unit 1 when I was testing it on a private server.\
I assume that pump shutoff is instant (like in unit 1). In unit 2, these repairs may actually be easier, since pump lag is benefitial for once.
Repairs flagger
Useful if you get disconnected from the game from time to time, or just don't like in-game clipboard.
Credits
- This guide by Avalakaba (@kopa_tel_oflain) for the MCC formula (RPV capacity is slightly wrong in this one, it should be 7500 kg/m, not 10000 kg/m)
- This website by Nxrvi for the previous Gen Load to APR and APR to Feedwater flow formula.
Downloads
Check releases for precompiled app or build it yourself from source.
You will need .Net Framework v4.8.1 to compile it.
Extra
Feel free to give suggestions or report any bugs via issues.
Caution
i'm not responsible if I get your reactor explodet, sowwy :3